JACOBSON AND ASSOCIATES
   
 
 
 Click on text below photos to enlarge.
1 Before 1 After A residential client’s end-table is dented and scuffed by a moving company during transit.

On-site repairs include burn-in filling of dents and touching-up scuffed areas.
1 Before 1 After A building management company’s tenant dooris damaged during an attempted break in. The door skin veneer and part of the core is gouged.

The gouge is filled and shaped. The repair is touched up and the finish is
re-grained.
1 Before 1 After A residential client’s sofa arm wood detailis gouged.

On-site repairs include burn-in filling of the gouge and touching-up after repair.
7 Before 8 After A building management company’s tenant door sign is incorrectly removed damaging the veneered door skin and leaving areas of silicone adhesive.

The silicone adhesive is removed, the damaged veneer is burned-in and the finish is touched-up and re-grained.
 




Home| About Us | Services | For Building Managers | Gallery | Contact | Links

© Copyright 2008 JacobsonandAssociates.net. All rights reserved.